Step 2: Plan how you'll test your assumptions
You've spelt out what your intervention design assumes. Now plan how you'll test it.
Mark Winters Co-founder and CEO
Say "monitoring" and most people think of indicators. But they're only half of it. Think of monitoring like a French dish cooked two ways: two preparations that together make it whole. Indicators, and conversations and observations, bring contrast and completeness. This step plans both.
Choosing indicators
Indicators are measures, usually numbers, defined up front and collected the same way each time, so you can see trends over time. Most should come from the partner's own records, ideally ones it finds useful anyway. Agree what's practical and useful, and build this into the contract.
Most of your indicators should measure performance. Behaviour is what an actor does, whilst performance is its result. If you produce something, there's an output: growing crops gives farms a harvest, and designing an investment incentive gives government something it can offer investors. If you exchange something, there are at least two outputs. When selling the harvest, the farm gets cash and the buyer gets crops. When granting the incentive, government secures a commitment to invest, and the investor gains tax relief.
Whether actors are producing something or exchanging it, you can measure six things about the output. Treat these as a menu to support your thinking:
- Quality – is it good enough?
- Quantity – how much is produced or exchanged?
- Productivity – what's the yield?
- Price – what does it sell for?
- Timing – does it arrive when it's needed?
- Type – is it what's needed?
A common mistake is to put indicators against every box in the theory of change. You end up with reams of numbers, many of them useless. Start from your assumptions instead, especially the incentives assumptions: what would tell you whether they hold?
Keep the set small; a few indicators collected well are worth more than a long list collected badly. You don't need an indicator for every assumption: some are better tested through conversations and observations.
The usual advice applies: collect data regularly, so there's something fresh for each reflection meeting (step 4), and get a baseline before the change begins.
Planning conversations and observations
Conversations and observations add what numbers can't show: how people feel about the change. That matters because what an actor does depends on whether they believe it's worth it. Things might look fine in the numbers while an actor is losing faith, or look poor while they're more committed than ever.
Conversations and observations have four jobs, in this order:
- Test the assumptions. As the intervention goes on, do actors still think it's worth it? Is anything still in the way?
- Make sense of the numbers, and get ahead of them. Does what you are hearing and seeing fit with your indicator data?
- Listen for problems, opportunities and effects you didn't expect.
- If you have time left, ask what factors contributed to the change. Whoever evaluates it later will thank you.
At this stage, you don't need data collection tools. Note down a few questions and who you'd like to speak to. Aim for a range of actors: those who've made the change, those who haven't, and especially anyone who tried it and stopped.
Livestock example: the company (extract)
Behaviour change. The company sets up and runs an aggregation centre close to pastoralists, buying direct, and keeps it going once the grant ends.
Incentives assumption. We assume the centre's benefits outweigh its costs, so it's worth the company keeping it going without the programme.
- Key indicators, to judge whether the centre is worth it to the company: head bought per month, by route; daily weight gain, by route; margin per head, by route, after the centre's running costs.
- Conversations and observations: ask the company whether it still thinks the centre is worth it. Talk to pastoralists who sold once and didn't come back: what kept them away?
Blockers assumption. We assume the main thing in the way is know-how, and that the programme's TA will overcome it.
- Conversations and observations: watch a buying day. Can staff judge animals and set prices without the adviser? Is anything else in the way?
Aquaculture example: hatcheries (extract)
Behaviour change. Hatcheries advise pond farmers on recommended practices, from stocking to harvest, and keep doing so at their own cost once the programme steps back.
Incentives assumption. We assume the extra repeat custom from advised farmers is worth more to hatcheries than the cost of advising them, so it's worth carrying on without the programme.
- Key indicators, to judge whether advising is worth it to hatcheries: total cost of advice (staff days, transport and materials), set against repeat sales in the hatchery's sales record.
- Conversations and observations: ask hatcheries whether they still think it's worth it and, if the programme stopped paying tomorrow, what they would keep. Talk to advised farmers who bought their next batch elsewhere: why?
Blockers assumption. We assume two things are in the way, know-how and uncertainty about the payoff, and that the programme's training and cost-sharing will overcome them.
- Conversations and observations: visit each hatchery at least quarterly. Can staff teach the practices without the consultant? Can they now say what advising costs and what it brings?
Okay, you've got a plan. Step 3 is carrying it out.